Read 255 times
So it goes &
it came to passit is now time to think in terms of sub's 9 PAS
Quantities of these should be assembled per plan
in all probability they should be concived of AS
MODULAR rather than as unibody | ISS not Toyoto
the forward section is the work area . Many tasks
are preconcieved and design by subassembly parts.
For example kelp harvistors, kreal katchers
gold miner, well drillers, tunnel makers etc.
the second {mid) section is the control module
again by means of sub module design . etachable
wing tanks holding propulsion drives | plug in
detachable electrical supply units etc etc
the aft unit of a 3 unit craft would be quarters
thus <AFT)quarters})CONTROL})WORK SPACE_\ FWD>
allowing for
)Q})Q})C})C})C})w_\configurations
1:38 WeLL i guess U get the idea Modular not UNaBody
i should have shown more crew Quarters (3x3} and fewer (Con}
{never mind| the concept is that the propulsion & main power units
attach externally or short wing extensions are not yet even ideas
and will be years prior to completion so temp's must do ?/? ONE
concept is to turn the control module upside down such that the
wings extend down instead of up ,O, and crawler treads would be
used to propel the craft along the bottom rather than thru the water
it of course remains a mystery how it will go,
My main point again is Modular, to get away from Unabody
http://openarchitecturenetwork.org/node/2910
the main concept is to NOT think in Square terms
instead think about spheres & cylinders | seals & attachments
standards of size shape connectivity? ISS designs NOT 4Earth designS get A hat Like the Admirals hat y at 02:03:37 AM
PUT THE HAT, up on a shelf/stand, in a small room, at the port,
WHERE you discuss progress/LaCK.thereof on sub construction
with 5 others, count yourself as #6 . do NOT wear the hat!
as far as hair do? think bee hive, afro friz, Mohawk , hair above head
not hair below sholders.
get the 1st sewer pipe? 8, 10, or 12ft diameter by length 20 or 25 Maybe 10
of corragated iron/steel culvert pipe in place on way for preliminary mock up
of the grews quarters 3/QU . No plans are required at this stage, only action
AS for the remainder of the year, it pure trial and error / With no plans at all.
except the HAT plan. My guess is it is best to ASK Putin what NOT to do.
as i AM sure by now he has a very firm opinion on the subject. Lots of U sure